Polymetal has completed the divestment of its Russian business on 7 March 2024. Please see the relevant announcement at the link. Operating and financial results as well as other information on this website until 7 March 2024 represent the Group in its former organizational structure, i.e. including Russian business, unless otherwise stated.

11 November 2019

Polymetal is pleased to announce an 18% increase in Ore Reserves at Kyzyl gold deposit to 8.5 Moz of gold in accordance with the JORC Code (2012).

“We have concluded the first stage of extending open-pit life-of-mine at our flagship operation. The next step is to estimate Ore Reserves at East Bakyrchik in Q4 2020”, said Vitaly Nesis, Group CEO of Polymetal.

  • The updated JORC-compliant Ore Reserve estimate as of 1 July 2019 comprises 41.7 Mt of ore with an average grade of 6.3 g/t containing 8.5 Moz of gold. This represents an 18% increase in gold contained in comparison with the reserves as at the end of 20181.

  • Open-pit reserves increased by 37% to 4.2 Moz of gold contained at an average grade of 5.7 g/t, while underground reserves were up 4% to 4.3 Moz of gold contained at an average grade of 7.1 g/t.

  • Total life of mine extended by 8 years (to 2047), while life of mine for the open pit added 5 years (to 2031) in comparison with the previous Feasibility Study estimate conducted in 2015 (“FS”).

  • The updated Ore Reserve estimate incorporates data from the drilling campaign (additional 239 diamond drill holes, 41.5 km of drilling) which resulted in extension of mineralization zones within the existing ore bodies and update of the resource model.

  • Cut-off grades decreased from 2.0 g/t to 1.0 g/t for the open pit and from 3.7 g/t to 3.0 g/t for the underground compared to the previous FS. The decline was driven by lower mining and processing costs based on actual operational and economic data and lower concentrate processing and transportation expenses which now take into account concentrate processing at the Amursk POX.

  • The new mining schedule assumes increased capacity of the Kyzyl processing plant which grew from the originally designed 1.8 Mtpa to 2.0 Mtpa in 2019.

Ore Reserves (Proved + Probable) changes

Ore Reserves

Category

01.01.20191    

01.07.2019

Change, %

Open pit

Tonnage, Mt

13.6

22.9

+68%

Au grade, g/t

7.0

5.7

-19%

Au content, Moz

3.1

4.2

+37%

 

 

 

 

 

Underground

Tonnage, Mt

15.1

18.8

+25%

Au grade, g/t

8.5

7.1

-16%

Au content, Moz

4.1

4.3

+4%

 

 

 

 

 

Total

Tonnage, Mt

28.7

41.7

+45%

Au grade, g/t

7.8

6.3

-19%

Au content, Moz

7.2

8.5

+18%

Ore Reserves reconciliation, Moz

Ore Reserves, 01.01.2019

Depletion

Revaluation

Ore Reserves, 01.07.2019

7.2

-0.2

+1.5

8.5

Notes: Discrepancies in calculations are due to rounding. This note applies to all tables in this release.

ORE RESERVES

The Ore Reserve estimate is reported in accordance with the JORC Code (2012) as at 1 July 2019 using a gold price of US$ 1,200/oz and was prepared by Polymetal. A cut-off grade of 1.0 g/t of gold was applied for the open pit and 3.0 g/t for the underground. Ore Reserves were estimated solely for Zone 1 of the Bakyrchik deposit, Zone 2 (East Bakyrchik) reserves were not estimated.

Kyzyl Ore Reserves estimate as at 1 July 2019

Ore Reserves 

Tonnage,

Gold grade,

Gold content,

Mt

g/t

Moz

Proved

 

 

 

Open pit

1.2

6.3

0.3

Stockpiles

0.5

5.9

0.1

Total Proved

1.7

6.2

0.3

 

 

 

 

Probable

 

 

 

Open pit

21.2

5.7

3.9

Underground

18.8

7.1

4.3

Total Probable

40.0

6.3

8.1

 

 

 

 

Proved+Probable

 

 

 

Open pit

22.5

5.7

4.1

Underground

18.8

7.1

4.3

Stockpiles

0.5

5.9

0.1

Total Proved+Probable

41.7

6.3

8.5

MINERAL RESOURCES

The Mineral Resources estimate for Zone 1 is reported in accordance with the JORC Code (2012) as at 1 July 2019 using a gold price of US$ 1,200/oz and was prepared by Polymetal. A cut-off grade of 1.0 g/t of gold was applied for the open pit and 3.0 g/t for the underground. The Mineral Resources estimate for Zone 2 was prepared by RPA Inc. in accordance with the JORC Code (2012) as at 1 January 2015. Cut-off grades for the open pit and the underground are 2.0 g/t and 3.7 g/t of gold, respectively. Revised estimate for Zone 2 was not conducted due to the lack of material changes.

Kyzyl Mineral Resources estimate

Mineral Resources

Tonnage,

Gold grade,

Gold content,

Mt

g/t

Moz

Indicated

Underground (Zone 1)

2.3

5.0

0.4

Total Indicated

2.3

5.0

0.4

 

 

 

 

Inferred

 

 

 

Open-pit

0.5

3.8

0.1

  Zone 1

0.2

2.3

0.01

  Zone 2

0.3

4.8

0.05

Underground

10.8

6.7

2.3

  Zone 1

2.4

6.4

0.5

  Zone 2

8.4

6.8

1.8

Total Inferred

11.4

6.6

2.4

 

Indicated + Inferred

 

 

 

Open-pit

0.5

3.8

0.1

  Zone 1

0.2

2.3

0.01

  Zone 2

0.3

4.8

0.05

Underground

13.1

6.4

2.7

  Zone 1

4.7

5.7

0.9

  Zone 2

8.4

6.8

1.8

Total Indicated + Inferred

13.6

6.3

2.8

Notes: Mineral Resources are additional to Ore Reserves.

ABOUT KYZYL

Kyzyl is a world-class asset located in north-eastern Kazakhstan in a traditional mining region with good infrastructure and easy access to grid power and the railway. In 2014, the asset was acquired by Polymetal. The initial Feasibility Study and the updated Ore Reserve and Mineral Resource estimates was completed by the Company in 2015.

The operation comprises the Bakyrchik refractory gold deposit and a state-of-the-art 2.0 Mtpa processing plant employing conventional flotation technology. The ultimate product of the production facility is flotation concentrate. Low carbon concentrate is sent for processing to the Company’s POX facility in Amursk, while the high carbon concentrate currently goes to third party off-takers. With the launch of POX-2, Polymetal intends to process 100% of Kyzyl concentrate in-house.

Competent persons

This estimate was prepared by employees of JSC Polymetal Management Company and JSC Polymetal Engineering, subsidiaries of the Company, led by Mr. Valery Tsyplakov.

Mr. Tsyplakov is employed full-time as the Managing Director of JSC Polymetal Engineering and has more than 18 years’ experience in gold, silver and polymetallic mining. Being a Member of the Institute of Materials, Minerals & Mining (MIMMM), London, he is a Competent Person under the JORC Code.

Listed below are other Competent Persons employed by the Company that are responsible for relevant research on which the Mineral Resources and Ore Reserves estimate is based:

  • Geology and Mineral Resources – Victor Pchelka, Head of Production and Geology Department, Polymetal Eurasia, PONEN, MIMMM, with 33 years’ relevant experience;

  • Mining and Ore Reserves: Open Pit -  Dmitriy Teterin, Head of Mineral Resources and Ore Reserves Audit Department, Polymetal Engineering, MIMMM, with 10 years’ relevant experience; Underground - Andrei Somov, Head of underground mining Department, Polymetal Engineering, MIMMM, with 31 years’ relevant experience

  • Concentration and Metals – Igor Agapov, Deputy Director of Science and Technology, Polymetal Engineering, MIMMM, with 21 years’ relevant experience.

All the above-mentioned Competent Persons have sufficient experience that is relevant to the style of mineralisation and types of deposits under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code).

All Competent Persons have given their consent to the inclusion in the report of the matters based on their information in the form and context in which it appears.


1Previous JORC-compliant estimate was prepared by RPA Inc. as at 01.01.2015. Price: Au = US$1,200/oz. Revised estimate prepared by Polymetal as at 01.01.2019 accounts only for depletion.



Back to press releases

Download release PDF (262 KB) Re-domiciliation Q&A
Investor Relations Contacts

Tel. +44.20.7887.1475

Evgeny Monakhov

Tel. +7.7172.476.655

Kirill Kuznetsov
Send mail

You are downloading Integrated Annual Report . Please note that some ESG data are available in Sustainability Performance Data 2021 (GRI and SASB) that outlines our key non‑financial performance information for financial year 2021. While the selected annual report is being downloaded, we want to draw your attention to the Sustainability Report. It provides detailed information on ESG indicators.

While the selected files are being downloaded, we want to draw your attention to the reports on the sustainable development of the company. They provide detailed information on ESG indicators.

You can also download historical data on sustainable development.

2019